New kitchen renovations or kitchen remodeling can prove to be an advantage through placing Ready to Assemble (RTA) cabinets in your kitchen or any space that may require storage solutions. Whether you are renovating your kitchen, bathroom or laundry, RTA cabinets give you an option for doing it yourself and a range of design and style choices. This way, you will learn about how it is done, from preparation to the final stage of installation of the RTA cabinets.
Step 1: Plan and Measure Your Space
However, in an RTA cabinet business, there is no way that you fix your cabinets and overlook the space where the RTA cabinets will be placed without measuring it. Correct measurements guarantee that the required number of cabinets is installed and that they are of the correct size. Measuring rods must be used to find out the height, width and depth of the wall and floor in the shop space. Remember all the positions of windows/doors/appliances/plumbing to prevent problems arise in the future while fixing the furniture. Another advantage of having a layout or a blueprint for the room is that it will give you an idea of where to place the cabinets and ensure all are well arranged.
Step 2: Assemble the Cabinets
RTA Cabinets are shipped in flat pack forms and are required to be assembled before they can be installed. Pay keen attention to this aspect as every cabinet type will recommend a different way of assembling cabinets. In most cases, you may require simple apparatus such as a screwdriver, hammer as well as a drill to build the frames. First of all, put all parts of your furniture – side panels, back panels, shelves, and doors side by side to keep all the elements in sight. Mount the base or the wall cabinet boxes at first and always remember, if necessary use glue or fasteners on the joints for a more strong build. During this process, make sure the cabinets are square and strong, so when they are put in later, the floor will not be off.
Step 3: Prepare the Installation Area
After the framework is complete, it is the preparation of the installation area of the cabinets. Gutting means you strip your existing cabinetry out and ensure that the area is free from any hindrances or dirty materials. Make sure to find the wall studs since the cabinets need to be installed on wall studs for optimum support. On the wall where the cabinets will be fixed, use an appropriate marker pen and mark the stud locations. When using the Stud Finder it is also useful to draw a horizontal line on your wall to show the top height of your base cabinets to show that they are flush or level.
For base cabinets of; on the wall, use a level to measure and draw a line of the height of the cabinets. When placing the upper cabinets, locate where the bottoms of the cabinets will sit, which should create enough space between countertops and bottom of upper cabinets to move around.
Step 4: Install the Base Cabinets
The beginning at the installation process is to conduct the location of the base cabinets. Install the first cabinet where required and spread shims underneath it in order to levelling the base on the floor. It is essential to pay attention to the level of the cabinets so that when putting them up it will be appropriate. Level horizontally and vertically most of the cabinets for effectiveness. After the base cabinets are set, secure them by inserting pilot holes through the backs of the cabinets to the wall stud. The cabinets should be tightened other than using nails, but do not apply too much pressure that you might end up damaging the cabinets. Only move on to the other base cabinets after bolting the first one into place, then clamp them side by side to remain firmly connected.
Step 5: Install the Upper Cabinets
This is a challenge when fitting upper cabinets, as they have to be hoisted into place. Ideally, it is better to locate this step with the help of another colleague. Fix the upper cabinets in the right position with regards to the lines you have drawn on the wall. Once again, you may use shims if needed to make sure they are level with each other. Screw through the back of the cabinets into the wall studs using pilot holes. Due to construction of upper and base cabinets, there must be equal distance between them, which can be achieved by placing a temporary wall for the upper cabinets to be positioned on during the construction process.
Step 6: Applies doors, drawers, and all the hardware
After the cabinet boxes are properly installed it is now time to add the doors, drawers, and any fitting. Refer to the manufacturer’s instructions when placing the hinges for the doors and the drawer slides. Check whether all the doors are properly installed and properly opening and closing. You can fine tune them to make the doors leveled and the doors shut properly to the floor. Putting on the handles and knobs on the cabinet is the last thing before calling it a day. It is wise to follow a template or guide to avoid making some several mistakes of installing the hardware in a haphazard manner that does not coordinate properly with all the cabinets.
Step 7: Finishing Touches
Once all the cabinet casework has been framed and anchored into place on the walls, it is important to put in any complementary components like molding, fillers, or other trim pieces as a finishing touch. These customized elements can assist in filling in the space where the cabinets meet the wall or floor and offer a much cleaner look. Last, clear the floor and surround and have new cabinets and doors!
Conclusion
Using RTA cabinets is an interesting job, which helps to create both functional and beautiful looking space. If the space has been well planned and the cabinets sourced and arranged appropriately, and following the correct procedures for assembly and installation, then it is possible to obtain a professional finish for relatively little money. No matter if you are remodeling the kitchen, bathroom, or even the laundry room, you can benefit from the amazing modern RTA cabinets.
For more information, make sure to visit IndoorLavish